Engineering Inspections

Scheduling an Inspection


Scheduling Concrete Inspections: 24 hours notice must be given. To schedule an inspection for work in the Right-of-Way call 937-237-5811 *Please note that work in the Right-of-Way must be done by a contractor that is bonded through the City. (See the Bonded Contractor page for a current list of bonded contractors)

Forms Inspection - After forms are placed, before concrete is poured.

Final Inspection - 10 to 14 days after work is complete and area is completely restored.

Scheduling Residential Site Plan Inspections: The City requires a 5 business day notice prior to scheduling a final site inspection. To schedule an inspection email us or call 937-237-5810.