Projects - Underway / Upcoming
Projects Underway/Upcoming
Project Name: Stormwater Management – (Project Completed)
Contractor: W. E. Smith Construction – Sections 1 and 2
                    Durst Brothers – Section 3
Project Description:Â The 2010 Stormwater Management program consists of Section 1: Stabilizing a Section of Twin Creek; Section 2: Stabilizing a Section of Dry Lick Run North of Charlesgate; and Section 3: YMCA Storm Sewer Improvements.
Project Name:Â 2010 Sidewalk Program
Contractor:
                 A-1 Concrete Leveling Company – Section B
                 Durst Brothers – Section E
Project Description: Sidewalks are to be repaired that are in poor condition. Section A is replacement of concrete, sidewalks, and aprons; Section B is sidewalk blocks raised; Section C is for new sidewalk constructions; Section D is for the concrete portion of the street program; and Section E is for the new concrete curb.
Project Name:Â 2010 Street Improvement Program
Contractor: John R. Jurgensen Co. – Section A
                    Durst Brothers Excavating – Section B
                    American Pavements – Section C
                    Pavement Technology – Section D ReclamiteÂ
                     Surfacing
Project Description: Streets have been identified to be repaired that are in poor condition. Section A is Street Improvements; Section B is sanitary sewer, manhole and valve work; Section C is Sealing; and Section D is reclamite surfacing.
Project Name:Â Water Tower Painting for Emeraldgate Standpipe
Contractor:Â Worldwide Industries, Inc.
Project Description:Â The exterior repainting of the Emeraldgate Water Standpipe.
Project Name: Water Main Replacement and Street Improvement Program, Phase II – To be bid September 3, 2010 (11:00 am eastern daylight savings time)
Contractor:
Project Description:Â Streets have been identified which are in urgent need of water line replacement and asphalt repair.
Project Name: Brandt Pike, Phase VII – To be bid August 27, 2010 (11:00 am, eastern daylight savings time)
Contractor:Â
Project Description:Â Widening and Improvements to Brandt Pike, Phase VII for vehicular and pedestrian safety.
Project Name:Â Demolition of Swimming Pool Facility (Project Completed)
Contractor:Â Charles Jergens Construction
Project Description:Â The City swimming pool will be demolished and debris removed and lot replaced back to land.
Project Name:Â
Contractor:Â Lynde Supply, Inc.
Project Description:Â Replacement of the culvert on
Project Name:Â Traffic Corridor Safety Study
Contractor:Â TEC Engineering, Inc.
Project Description:Â Traffic Corridor Safety Study to be conducted on Brandt Pike and Old Troy Pike from
Project Name: Rehabilitation of Sewer Lines – (Project Completed)
Contractor:Â Miller Pipeline
Project Description: Improving the City’s sanitary sewer system.
Project Name: Rehabilitation of Sewer Manholes – (Project Completed)
Contractor:Â Municipal & Contractors Sealing Products, Inc.
Project Description: Improving the City’s sanitary sewer system.
Project Name:Â Design Old Troy Pike, Phase VIII Design
Contractor:Â Mote & Associates
Project Description:Â For the engineering of improvements to Old Troy Pike, Phase VIII for vehicular and pedestrian safety.
Project Name:Â Digital Data Conversion Services Water System, Phase II
Contractor:Â ARS Group
Project Description:Â Eighteen month contract for the Digital Data Conversion Services Water System, Phase II providing improved water services and increased productivity to citizens.