Projects - Underway / Upcoming
Projects Underway/Upcoming
Project Name:Â Stormwater Management
Contractor:    W.E. Smith Construction – Section 1
                     Waitzman Landscape Co. – Section 2
Project Description:Â The 2011 Stormwater Management program consists of Section 1:Â Kellenburger Drainage Ditch Work; and Section 2:Â Wakeview-Timberview Rear Yard Drainage WorkÂ
Project Name:Â 2011 Sidewalk Program
Contractor:    Leo B. Schroeder, Inc. – Sections A and C
                     A-1 Concrete Leveling Company – Section B
Project Description: Sidewalks are to be repaired that are in poor condition. Section A is replacement of concrete, sidewalks and aprons; Section B is sidewalk blocks raised; and Section C is the concrete portion of the street program.
Project Name:Â 2011 Street Improvement Program
Contractor:    John R. Jurgensen Co. – Section A
                     Durst Brothers Excavating – Section B
                     American Pavements, Inc. – Section C
                     Pavement Technology – Section D
Project Description: Streets have been identified to be repaired that are in poor condition. Section A is Street Improvements; Section B is sanitary sewer, manhole and valve Work; Section C is sealing; and Section D is reclamite surfacing.Â
Project Name:Â Water Main Replacement and Street Improvement Program, Phase II
Contractor:
John R. Jurgenson Co. – Section A: Kitridge, Monitor, Harshmanville
Sections C Lambeth and D Mahler – Milcon, Inc.Â
Project Description:Â Streets have been identified which are in urgent need of water line replacement and asphalt repair.
Project Name:Â Painting of the Chambersburg Water StandpipeÂ
Contractor: Fisher Tank Company
Project Description:Â Painting of the Chambersburg Water Tower
Project Name:Â Brandt Pike, Phase VII
Contractor:Â Barrett Paving Materials, Inc.
Project Description:Â Widening and Improvements to Brandt Pike, Phase VII for vehicular and pedestrian safety.
Project Name:Â Design Old Troy Pike, Phase VIII Design
Contractor:Â Mote & Associates
Project Description:Â For the engineering of improvements to Old Troy Pike, Phase VIII for vehicular and pedestrian safety.
Project Name:Â Digital Data Conversion Services Water System, Phase II
Contractor:Â ARS Group
Project Description:Â Eighteen month contract for the Digital Data Conversion Services Water System, Phase II providing improved water services and increased productivity to citizens.
Â