Projects - Underway / Upcoming

 
 
 
2011 Projects
  

 

 

Projects Underway/Upcoming

 

Project Name:  Stormwater Management

Contractor:     W.E. Smith Construction – Section 1

                      Waitzman Landscape Co. – Section 2

Project Description:  The 2011 Stormwater Management program consists of Section 1:  Kellenburger Drainage Ditch Work; and Section 2:  Wakeview-Timberview Rear Yard Drainage Work 

 

Project Name:  2011 Sidewalk Program

Contractor:     Leo B. Schroeder, Inc. – Sections A and C

                      A-1 Concrete Leveling Company – Section B

Project Description:  Sidewalks are to be repaired that are in poor condition.  Section A is replacement of concrete, sidewalks and aprons; Section B is sidewalk blocks raised; and Section C is the concrete portion of the street program.

 

Project Name:  2011 Street Improvement Program

Contractor:     John R. Jurgensen Co. – Section A

                      Durst Brothers Excavating – Section B

                      American Pavements, Inc. – Section C

                      Pavement Technology – Section D

Project Description:  Streets have been identified to be repaired that are in poor condition.  Section A is Street Improvements; Section B is sanitary sewer, manhole and valve Work; Section C is sealing; and Section D is reclamite surfacing. 

 

Project Name:  Water Main Replacement and Street Improvement Program, Phase II

Contractor:

John R. Jurgenson Co. – Section A: Kitridge, Monitor, Harshmanville

Sections C Lambeth and D Mahler – Milcon, Inc. 

Project Description:  Streets have been identified which are in urgent need of water line replacement and asphalt repair.

 

Project Name:  Painting of the Chambersburg Water Standpipe 

Contractor: Fisher Tank Company

Project Description:  Painting of the Chambersburg Water Tower

 

Project Name:  Brandt Pike, Phase VII

Contractor:  Barrett Paving Materials, Inc.

Project Description:  Widening and Improvements to Brandt Pike, Phase VII for vehicular and pedestrian safety.

 

Project Name:  Design Old Troy Pike, Phase VIII Design

Contractor:  Mote & Associates

Project Description:  For the engineering of improvements to Old Troy Pike, Phase VIII for vehicular and pedestrian safety.

 

Project Name:  Digital Data Conversion Services Water System, Phase II

Contractor:  ARS Group

Project Description:  Eighteen month contract for the Digital Data Conversion Services Water System, Phase II providing improved water services and increased productivity to citizens.